Challenge
Existing rubber lined collector trough failing due to age and corrosion, repair would require total removal/replacement of internal rubber coating to entire demister duct.
Action
Design new flanged trough and fabricate at our works replacement unit. Trial fit on site and flange main demister duct to suit.
Result
New trough rubber lined off site and installed. Future repairs can be affected with minimal downtime and impact on installed plant.